Free tool · Flippers, wholesalers & landlords

Rehab cost estimator

Build a repair budget for a house line by line: tick what it needs (paint, flooring, kitchen, bathrooms, roof, HVAC, windows and more), and quantities follow the house size while costs follow the finish level and your area. Add a contractor’s fee, permits and a contingency to see the total, the cost per square foot and how it compares with investors’ rules of thumb, then carry the number into the MAO, flip or BRRRR calculator. It runs in your browser; nothing is sent anywhere.

Runs in your browser · free · no sign-up

The house

1Size and finish
Rental: durable, basic. Flip: what buyers expect. Premium: higher-end.
Much higher: e.g. big coastal cities
2What the house needs

Tick what needs doing to see and change its quantity and cost. Quantities follow the house size; costs follow the finish level. Type over any of them with your contractor’s numbers.

Interior

—
—
—
—
—
—

Kitchen & baths

—
—

Systems

—
—
—
—
—

Exterior

—
—
—
—
—

Site & cleanup

—
—
—
—
3Contractor, permits and surprises
10–20% if a GC runs the job; 0 if you manage the trades
10% cosmetic, up to 20% for big or older houses
A typical building permit; more for big jobs. Ask your city

Estimated rehab cost

$65,820

$43.88 a sq ft · medium rehab by investors’ rules of thumb

The work
$55,800
Ticked items × your area
Contingency
$8,370
For what you find once walls are open
Contractor’s fee
$0
Overhead and profit
Permits
$1,650
Building permit

Where it goes

    Investors’ rules of thumb for this house

    RehabPer sq ftThis house

    Use this number

    How it works

    How to estimate rehab costs

    A rehab budget is the sum of every job the house needs, each one a quantity times a cost per unit: square feet of paint and flooring, one kitchen, each bathroom, squares of roof, each window. The starting costs are rounded US national figures for 2025 from Angi and HomeAdvisor cost guides and the 2025 Remodeling Cost vs Value report (a minor mid-range kitchen remodel averages $28,458 and a mid-range bathroom remodel $26,138 nationally). Building costs differ a lot by area, so pick your area’s level, then type over any line with a real quote.

    On top of the work come permits, a general contractor’s fee if one runs the job (usually 10–20% for overhead and profit) and a contingency for what you find once the walls are open: about 10% for a cosmetic job and up to 20% for big or older houses. The rules of thumb many investors use to sanity-check a budget are roughly up to $40 a square foot for a light, cosmetic rehab, $40–75 for a medium one and $75–135 for a heavy one, more for a full gut; older forum rules such as $10/$20/$30 a square foot are out of date.

    Worked example

    A 1,500 sq ft house with 2 bathrooms, at flip finishes in an average-cost area: interior paint ($4,500), vinyl plank on 900 sq ft ($4,500), a kitchen update ($20,000), two bathroom updates ($24,000), a water heater ($1,400), two dumpsters ($1,000) and a yard cleanup ($400) come to $55,800 of work. With a 15% contingency ($8,370) and a typical permit ($1,650), the estimate is $65,820, or $43.88 a square foot: a medium rehab by investors’ rules of thumb. Run by a general contractor at 15% in a higher-cost area, the same job comes to about $86,500.

    The formula

    • Each line = quantity × cost per unit; the work = sum of the ticked lines × area cost level
    • Contractor’s fee = the work × GC %; contingency = (the work + contractor’s fee) × contingency %
    • Total = the work + contractor’s fee + contingency + permits; cost per sq ft = total ÷ house size
    • Quantities: paint = house size; vinyl plank = 60% of it; carpet = 30%; roof squares = house size × 1.15 ÷ 100

    Good to know

    • It’s a budget to plan and compare deals, not a contractor’s quote. Walk the house with a contractor (and an inspector for older houses) before you commit, and type their prices over the suggestions.
    • The suggested costs are rounded 2025 US national figures (Angi, HomeAdvisor, Remodeling Cost vs Value 2025). The area levels are broad (×0.85 to ×1.30), not a city cost index; local labour and material prices can differ more.
    • Foundation, mould, asbestos, lead paint, structural and code-upgrade work can cost far more than the typical figures. A contingency helps but doesn’t cover a house that needs major structural work.

    Questions about the Rehab cost estimator

    Short answers, with the maths where it helps.

    Something else? Ask me on WhatsApp or email me.

    All questions

    How do you estimate rehab costs on a house?

    List every job the house needs, multiply each by its quantity and cost per unit (square feet of paint and flooring, each kitchen and bathroom, squares of roof, each window), adjust for your area, then add permits, a contractor’s fee if you use one and a 10–20% contingency. The estimator does this line by line; replace its suggestions with your contractor’s prices.

    How much does it cost to rehab a house per square foot?

    Many investors use about $20–40 a square foot for a light, cosmetic rehab (paint, flooring, fixtures), $40–75 for a medium one with a kitchen and bathrooms, and $75–135 or more for heavy work with systems or a roof. A 1,500 sq ft house with a medium rehab is often around $60,000–110,000, but your area and the house decide the real number.

    How much contingency should I add to a rehab budget?

    About 10% for a cosmetic job on a newer house, and 15–20% for big rehabs, older houses or anything you couldn’t fully inspect. Surprises such as rot, wiring or plumbing behind the walls are the most common reason flips run over budget.

    What is the 70% rule for repairs?

    A quick filter flippers use: pay no more than 70% of the after-repair value minus the repairs. With this estimate as the repairs, use the “Maximum offer” link to see the most you should offer.

    Does a general contractor’s fee apply if I hire my own trades?

    No. A general contractor usually adds 10–20% to the trades’ prices for overhead and profit for running the job. If you manage the plumber, electrician and painter yourself, leave the fee at 0%, but expect to spend your own time on it.

    Is what I type saved or shared?

    No. The calculation runs in your browser and nothing is sent to my server. A results link carries the numbers in the link itself, so share it only with people you want to see them.

    Next step

    Flippers and wholesalers: more deals to run through this

    The we-buy-houses websites I build bring motivated sellers straight to you, with an address-first offer form, situation and city pages, and a dashboard that tracks every lead to the closing.